{
  "id": "2025-12-bago-nattalin-shutdown",
  "title": "Nattalin township internet and phone cut amid heavy bombardment, December 2025",
  "class": "regional",
  "type": "full_blackout",
  "status": "unresolved",
  "date_start": "2025-12-09T00:00:00.000Z",
  "resolution_note": "No source confirms a resolution date. The STOP record's own \"Dec 9 – at least Dec 14\" phrasing is a confirmed-active window (a lower bound on duration), not an end date — no date_end is set here since Dec 14 marks only when the record was last confirmed active, not when the cutoff stopped. Split from the former grouped event 2025-bago-region-shutdowns (maintainer research, 2026-07): Nattalin (Dec 2025) and Paukkaung (Feb 2025) are ten months apart, in different townships, and most plausibly tied to distinct military operations rather than one continuous regional pattern — kept as two separate events per the maintainer's explicit scope decision (internal research notes). Stale-ongoing review (M2 patch, 2026-07, carried over from before the split): a short, localized, bombing-triggered cutoff — general web search found no reporting of a continuing or renewed shutdown in this specific township into 2026.\n",
  "scope": {
    "regions": [
      "Bago"
    ],
    "townships": [
      "Nattalin"
    ],
    "asns": [],
    "operators": []
  },
  "confidence": "verified_ground",
  "detection_sequence": [
    {
      "layer": "stop",
      "at": "2025-12-09T00:00:00.000Z",
      "summary": "Access Now STOP record: internet and phone lines cut in Nattalin township (Dec 9 – at least Dec 14) amid heavy bombardment.",
      "signal_ids": []
    }
  ],
  "verified_by": [
    "access_now"
  ],
  "narrative": "DRAFT — needs an editor rewrite. Access Now STOP record: internet and phone lines cut in Nattalin township, Bago Region, amid heavy bombardment, confirmed active from Dec 9 through at least Dec 14, 2025. Previously presented jointly with the Paukkaung township shutdown (Feb 2025) as one \"Bago Region\" regional pattern; split into two events (maintainer research, 2026-07) since the two incidents are ten months apart, in different townships, with no evidence of simultaneous or continuous region-wide disruption — see 2025-02-bago-paukkaung-shutdown for the other constituent record.\n",
  "sources": [
    {
      "label": "Access Now STOP Dataset record",
      "url": "https://www.accessnow.org/keepiton/"
    }
  ],
  "data_links": {
    "csv": "/data/events/2025-12-bago-nattalin-shutdown.csv",
    "json": "/data/events/2025-12-bago-nattalin-shutdown.json"
  },
  "technical_corroboration": {
    "layer": "ioda",
    "last_checked": "2026-07-20T00:00:00.000Z",
    "result": "recovered_to_baseline"
  }
}